Skip to content
TRANSMET SITE CLEARANCE
-
Renewal of the raw material supply system at the LD3 steelworks and clearance of the construction site for the future electric arc furnaces; approx. 800 metres of conveyor bridges, transfer towers and extension of the casting hall
-
Static Calculation, Basic drawings, Shop drawings